TWEAK IN

REVERSA LOAD OPTION #900
FIELD MOUNTING INSTRUCTIONS
for Four Channel Systems

PRINTED CIRCUIT BOARD
1. Turn off power to Load Monitor
2. On the Main Printed Circuit Board cut off completely eight (8) jumpers 
     PJ34 - PJ33 - PJ30 PJ29 -  PJ62 -  PJ63 -  PJ66 -  PJ67. These jumpers can be
     found approximately in the center of pc Board marked for the Reversa Load 
     Module to be set over them. Refer to drawing Fig. 5 in the Installation Manual
     or the Web Site Installation Manual.
3. Install two (2) Reversa Load Module TLD-425 on Main Printed Circuit Board .
     Follow white arrow on PC Board and match up with black arrow on Reversa
     Load Module for proper pin alignment. Push down the Module into the PC
     Board. After each Reversa Load Module has been inserted, screw down
     using the screw provided.  Make sure all shipping material is removed from
     underneath the Reversa Load Module before installing.    

MOUNTING SWITCH
1. Drill a 1/4 inch hole on the right side of the Load Monitor box, two inches
   
 from the top.
2. Insert switch into hole with wires on the inside of the box. Secure
   
 tightly with the lock nut and star washer provided.
3. Adhere “reversa Load” label above switch.

INSERTING WIRES WITH PINS TO CONNECTORS ON PC BOARD
1. Female pin from switch is inserted into connector #4—PIN #19
   
 (Top left side on PC Board).
2. Male pin from switch is inserted into connector #1—PIN #21
   
 (Bottom left side on PC Board).
3. Use white wire tabs to route wires along the inside top of box.

 

 

 TWEAK IN