IMCO LOGOIMCO COMPANY PROFILE

  ADVANTAGES

ABOUT US

PRODUCTS

GO GLOBAL

HOME

IMCO International Ltd. provides certified factory servicemen that can perform Installation and Calibration procedures, but due to the simplicity of these necessary procedures, Calibration Equipment can be purchased and performed by the customer or a IMCO Serviceman can be hired to teach the Calibration Procedure.  Customers can also do their own installation on their presses or hire a IMCO Serviceman.
SERVICE

PARTS  DIMENSIONS  MOUNTING  TWEAK IN

       

A complete Pictorial Manual giving step by step detailed instructions is supplied with each IMCO Load Monitor.  We recommend the customer do his own. 
It is remarkably simple!  You do not have to grind the surface to a micro inch flat finish.  No surface preparation is required.
                                                                                     

When mounting transducers, a disposable, self-sticking template is provided  for spacing dimensions.  Then using a typical hand drill, all you do is drill and tap two holes for each transducer.  No precision drilling!  Mounting brackets are easily screwed into the press columns or pitmans.  Welding, messy glue or cement adhesions are never used.

Next attach the factory
pre-wired transducers between the ball joint mounting brackets.  String cable from transducer to terminal connection in Control Box, connect the 120/220 volts A. C., 50-60 Hz. power to Control Box and use two wires to tie your clutch into emergency stop.  Very fast and easy!

IMCO's accurate, linear electronic piezoelectric "Crystal" Transducers and Systems are lab quality manufactured, but can take normal amounts of user and industrial environment abuse.  Special handling or technical personnel are not essential for installing.  Everything necessary for installation is supplied by IMCO, except the tools.




Simplicity of IMCO equipment normally will permit customer to do his own installation of the Piezoelectric Transducers  and the Control Box Mounting.

Piezoelectric Transducer- Bracket Mounting Template

 

 

Factory supplied instruction manual consist of:
 

  
 Attaching Piezoelectric "Crystal" Transducers as directed using
      provided templates.
 

   Mounting IMCO  Load Monitors using the provided shock mounts.
 
   Routing cable from Transducers to IMCO Load Monitor.
 
   MakingTransducer connections into IMCO Load Monitor.
 
   Making electrical connection into IMCO Load Monitor to enter either
      press emergency stop circuit or stop on top
circuit.
 
   M
aking electrical connection 120/220 Volts A.C. to IMCO System.

For specific dimensions for mounting the Control box refer to Control Box Mounting. 

Calibration Charges Use                   

MONDAY TO FRIDAY

BASIC FLAT RATE> $800.00 PLUS EXPENSES
Charge covers maximum of eight hours combination of travel and in plant work during
scheduled working day Monday through Friday.

Includes check out of customers installation and use of Calibration Equipment & Load Cells.

AFTER ANY COMBINATION OF EIGHT HOURS > $150.00 PER HOUR

SATURDAY

BASIC FLAT RATE> $1,200.00 PLUS EXPENSES
Charge inclusive as above description.

AFTER ANY COMBINATION OF EIGHT HOURS> $225.00 PER HOUR

SUNDAY

BASIC FLAT RATE> $1,600.00 PLUS EXPENSES
Charges inclusive as above description.

AFTER ANY COMBINATION OF EIGHT HOURS> $300.00 PER HOUR

EXPENSES

Travel To and From IMCO Factory, Frankfort, IL                  $     .45 per Mile
Meals                                                                                               $ 25.00
Overnight Lodging                               Prevailing Rate per Night
Terms                                                     Net 10 Days labor and Expenses               

INSTALLATION CHARGES

INSTALLATION PRICES ARE PER MACHINE

    OBI             $   350.00
GAP        $   350.00
C-FRAME    $   350.00
PRESS BRAKE $   350.00
SINGLE POINT STRAIGHT SIDE    $   350.00
KNUCKLE JOINT               $   350.00
TWO POINT STRAIGHT SIDE PRESS        $   700.00
FOUR POINT STRAIGHT SIDE PRESS         $1,400.00
DOUBLE ACTION           $1,650.00

 

Installation will include attachment of piezoelectric "Crystal" transducers to columns or pitman's of press, stringing of cables, connecting piezoelectric transducer cables to inside of Load Monitor. The connection to the A.C. power, machine cam controller or emergency stop circuit is not included  in the installation and must be performed by a quality electrician supplied by customer.

CALIBRATION AND PER DIEM EXPENSES CHARGES WILL BE
ADDED TO THE ABOVE PRESS INSTALLATION CHARGES

CONTACT US

IMCO.US    -    Manufacturing
9350 W. Laraway Road
Frankfort, Illinois  60423  U.S.A.

IMCO.US    -    Sales Office
1190 Harrison Road, Studio 4
Santa Fe, New Mexico  87507  U.S.A.

Phone:        505-438-4344

E-Mail:      imco@loadmonitors.com
           imco@imco.us        

           

   Information Request Form

Select the items that apply, and then let us know how to contact you.

Have a serviceperson contact me
Send company literature
Have a salesperson contact me

Name
Title
Company
Address
E-mail
Phone
Comments